EGPCO Projects and Experience

EGPCO Projects and Experience

ZOHR Development Project

The Zohr Gas development plant plays a crucial role in Egypt’s downstream natural gas sector, processing and distributing gas extracted from the Zohr field. During the construction phase, our staff successfully installed, preserved and commissioned over 360 equipment varied between rotating and static equipment. The mega project is currently contributing 2.8 BCF to the Egypt gas production.

Suez Canal Authority Stadium

The Suez Canal Olympic Stadium, located in Ismailia, Egypt, is a modern sports facility operated by the Suez Canal Authority with a capacity of 22,000 seats. Our team was responsible for the construction of all HVAC and fire fighting system in the project where we successfully installed: 80 tons of HVAC ducts 12 Air handling unit 240 Air conditioning concealed unit 3800 meters of Firefighting pipelines

The Egyptian Refining Company (ERC)

a major oil refining facility located in Mostorod, near Cairo, Egypt. It was established to help reduce Egypt’s dependence on imported petroleum products by upgrading the country’s refining capabilities Our team managed to successfully install, commission and startup around 270 rotating equipment and around 85 static equipment.

​Galala University

a national, non-profit university located on the Galala Plateau in the Suez Governorate of Egypt. Established by presidential decree in August 2020. Our ream was responsible for the installation of HVAC and Firefighting systems in two major buildings in the university: the faculty of Engineering and the Faculty of Arts.

Assiut Oil Refining Company (ASORC)

the largest oil and gas facility in Assiut, Egypt, serving as a critical hub for petroleum processing in Upper Egypt. Our team has successfully implemented the scope of installation, preservation, pre-commissioning and commissioning of around 520 rotating equipment and 190 static equipment.