Rotating and Static Equipment
Pre-Commissioning and Commissioning

At EGPCO, we specialize in implementing comprehensive pre-commissioning and commissioning activities for both rotating and static equipment. We have solid expertise in performing these activities for the following equipment as per either the international standards, manufacturers’ instructions or the project’s specification.

  • Pumps
  • Compressors
  • Fans
  • Blowers
  • Turbines
  • Pressure vessels
  • Towers
  • Storage tanks
  • Heat exchanger
  • Heaters
  • Boilers
  • Reactors
  • Filters

Our staff is highly skilled to perform these pre-commissioning and commissioning activities:

  • Installation, assemble, alignment (cold alignment) for all rotating equipment and packages as per work order.
  • First fill of lubricants, seal oils, barrier fluids and grease.
  • Mechanical seal auxiliary system installation including connecting piping.
  • Charging up the mechanical seal barrier and/or buffer liquid (as specified).
  • Un-coupled motor run test.
  • Alignment for rotating equipment items.
  • Filling Up (Pressurizing) liquid systems (as specified).
  • Final inspection checks and tests required before commissioning.
  • Performing operation test procedure (OTP) for all mechanical equipment.
  • Pressure vessels internals repair and installation.
  • Final box-up for all types of static equipment.